B&N conducted a Pedestrian and Bicycle Safety Study for the segment of Gulf Boulevard from Walsingham Road to the southern end of Sand Key Bridge, approximately 5.5 miles. The study included pedestrian and bike volume counts, crash analysis, and field observations to evaluate the existing pedestrian and bike facilities. Recommendations were then developed to install new and/or remove existing crosswalks, to modify existing lane widths for standard bike lanes, and installation of green bike lanes along the corridor.