April 17 - 19, 2019

The Westin La Paloma Resort Tucson, AZ Visit Event Website

Thursday, April 18
9:15-10:15 a.m.

In 2014, the 2,428-foot-long truss superstructure of the Milton Madison bridge made history when it was moved 55 feet from temporary bridge piers onto its permanent, rehabilitated piers, making it the longest bridge slide in North America. This presentation will detail the sliding process, the concepts used to maintain traffic and the temporary work needed to complete the project.

B&N Presenters:

Travis Butz, PE

Olivier Mirza, PE

Thursday, April 18
1:30-2:30 p.m.

A key consideration when implementing practical design solutions is the impact to safety. Safety is also an important metric to consider when selecting a preferred alternative or prioritizing projects. This presentation will use real project examples to illustrate how safety analyses, specifically the quantitative methods in the Highway Safety Manual (HSM), were used to justify and implement practical design solutions, evaluate multiple alternatives and prioritize projects. 

B&N Presenters:

Ravi Ambadipudi, PE, PTOE

Dana Biscan, PE

Kendra Schenk, PE, PTOE, RSP2I

Travis Butz, PE, Senior Bridge Engineer

TRAVIS BUTZ, PE
Senior Bridge Engineer

Olivier Mirza, PE, Senior Project Manager

OLIVIER MIRZA, PE
Senior Project Manager

Ravi Ambadipudi, PE, PTOE, Traffic Studies Director

RAVI AMBADIPUDI, PE, PTOE
Traffic Studies Director

Dana Biscan, PE, Transportation Planning Director

DANA BISCAN, PE
Transportation Planning Director

Kendra Schenk, PE, PTOE, RSP2I, Safety Engineer

KENDRA SCHENK, PE, PTOE, RSP2I
Safety Engineer